House Renovation — Hilversum / Project

House Renovation – Hilversum (Built in 1955)

This 1955-built residence in Hilversum underwent a major renovation between June and September 2024, transforming the ground floor into a modern, energy-efficient, and open-plan living space.

  • Project timeline: June – September 2024

Technical Upgrades:

  • Complete electrical system replacement
  • Installation of a new metercabinet
  • Modernization of all mechanical systems

Ground Floor Works:

  • Kitchen enlargement by removing the wall between kitchen and living room
  • Construction of an extension
  • Installation of a large skylight (3000 x 6090 mm)
  • Custom-made French doors opening to the garden
  • Crawl space insulation
  • Wall plastering and painting
  • Underfloor heating system with automated controls
  • Final floor finish installation
  • This project blends technical modernization with spatial openness and comfort, perfectly suited to contemporary living.
Living area

95 m²

Category

Renovation

Plot Size

164 m²