House Renovation in Kortenhoef (Built 1931–1944)
This residential property in Kortenhoef, built between 1931 and 1944, underwent a thoughtful renovation during the period of June to September 2024. The focus was on upgrading technical infrastructure, enhancing thermal performance, and refreshing the interior with a balance of classic elements and modern finishes.
- Project period: June – September 2024
Technical Upgrades:
- Complete replacement of electrical wiring
- Installation of a new metercabinet (meterkast)
- Renovation of mechanical systems
Ground Floor:
- Insulation of pitched roof between beams
- Reconfiguration of kitchen and living room layout
- Installation of a wooden kitchen window (1400 x 1900 mm)
- Wall plastering and painting
- Designer wallpaper in the living room
- Toilet renovation
- Laying of final floor finishes
First Floor:
- Wall plastering and painting
- Designer wallpaper in the children’s room
- Bathroom renovation
- Final floor finish installation
Second Floor:
- Full floorplan reconfiguration
- Wall and ceiling insulation in the dormer (dakkapel)
- Wall plastering and painting
- Laying of final floor finishes