Schoolpad Laren / Project
House renovation – Schoolpad Laren
- Project – partial renovation of the house
Implementation date 2024 - House of 1913
- Detached villa
Electrical works, installation of lighting, installation of junction box.
Engineering systems:
- installation of water supply and sewerage systems
- installation of underfloor heating on the ground floor
- installation of underfloor heating control automatics
- installation of exhaust ventilation system
Ground floor:
- VBI flooring of the ground floor
- insulation of ground floor walls from inside with insulation panels
- renovation of ground floor shower room and toilets
- plastering and painting of walls and ceilings
First floor:
- roof insulation
- insulation of the first floor walls from inside with insulation panels
- bathroom renovation: bathtub, shower, sink with two faucets, toilet, laundry area
- plastering and painting of walls and ceilings